[Mintwood-place] some info on 1852-54 Mintwood project
Jon August
jonaugust at gmail.com
Fri Jul 30 14:42:05 EDT 2010
I could have sworn I saw them digging out the basement a few months ago. Is
it possible this already happened without notification?
On Fri, Jul 30, 2010 at 2:40 PM, <maryjbelcher at comcast.net> wrote:
> Thanks to Denis, Bob & Ted (Kalorama Citizens Association) for taking time
> to go see the building plans.
>
>
>
> So if the neighbors on either side of the project have to be notified in
> advance about "underpinning work," maybe someone on this listserv should let
> those neighbors know (if they aren't on the Mintwood listserv). That way if
> they don't get notified, they can raise the matter with the builder and D.C.
> government.
>
>
>
> I noticed that the dumpster is gone,
>
>
>
> Mary
>
>
>
>
>
>
>
>
> ----- Original Message -----
> From: "Cynthia Pols" <polscm at aol.com>
> To: "Denis James" <denisjames at verizon.net>
> Cc: mintwood-place at lists.mutualaid.org
> Sent: Friday, July 30, 2010 2:35:47 PM
> Subject: Re: [Mintwood-place] some info on 1852-54 Mintwood project
>
> Thanks for the good report, Denis. I've attached a copy of the HPO staff
> report recommending that HPRB board approve this project. The report
> provides more detail as to what structural changes will be made. This review
> all happened quite some time ago (April 22).
>
> --Cynthia
>
> On Jul 30, 2010, at 2:00 PM, Denis James wrote:
>
> Three members of the Kalorama Citizens Association Executive Committee
> (VP and Mintwood resident Bob Ellsworth, Treasurer Ted Guthrie and myself)
> visited the DC Historic Preservation Office yesterday and met with
> Architectural Historian Anne Brockett (if you have questions, contact her
> at: anne.brockett at dc.gov or (202) 442-8842) to view the plans for this
> project, which is located within the Kalorama Triangle Historic District.
>
>
> We learned the following that may be of interest to neighbors:
>
>
> It is a matter of right project and has already been approved by the DC
> Historic Preservation Review Board (HPRB);
>
>
> There will be 13 condo units built;
>
>
> Though the developer will remove rear additions and then build on in the
> rear and add a partial new fourth story setback from the front so as not to
> be visible from the street, the building will still fall within the 60% lot
> occupancy requirement;
>
>
> The floor area ratio (FAR) does not exceed that allowed by the zoning of
> Mintwood Place;
>
>
> The developer has asked the Zoning Administrator for a parking waver for 7
> parking spaces. Zoning regs require there to be one off-street space for
> every two dwelling units constructed. As there is no public alley on that
> side of Mintwood, the other row-houses essentially have the same “right” of
> not having to provide parking on their lots;
>
>
> The new portions of construction in the rear will have a brick veneer;
>
>
> The basements will be dug out to provide more headroom. This will require
> underpinning. The developer is obligated to inform neighbors with shared
> party walls of this element of the construction.
>
>
> Denis James
> KCA President
> (202) 232-8829
> _______________________________________________
> Mintwood-place mailing list
> Mintwood-place at lists.mutualaid.org
> http://lists.mutualaid.org/mailman/listinfo/mintwood-place
>
>
> *
> *
>
>
> _______________________________________________
> Mintwood-place mailing list
> Mintwood-place at lists.mutualaid.org
> http://lists.mutualaid.org/mailman/listinfo/mintwood-place
>
>
> _______________________________________________
> Mintwood-place mailing list
> Mintwood-place at lists.mutualaid.org
> http://lists.mutualaid.org/mailman/listinfo/mintwood-place
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.mutualaid.org/pipermail/mintwood-place/attachments/20100730/bd5c3a22/attachment.html>
More information about the Mintwood-place
mailing list